Public Resourses
Welcome to T-SIM Simulation Services
Welcome Welcome to T-SIM's Simulation Service Department! Whether you are submitting a new tooling design for simulation, optimizing an existing tool, or requesting rechecks, we’re here to make the process smooth and efficient. Data With a wide ...
To Lift or Not to Lift... That is the question?
Is it better to have lift in a station or no lift? This is a question that is often debated in planning and design reviews. Engineers may argue that it helps give access for automation to better move the panels from station to station and helps ...
Make setting On-The-Bar Rotators EASY!
Rotating Parts from station to station At T-SIM, we work with hundreds of stampers and one thing that is a common challenge is tipping parts from station to station. Most stampers will try to utilize a drop-tip to accomplish rotation as simply as ...
Press Information Collection
Getting Started Collecting the information needed to create an accurate T-SIM Press Template can be challenging at times. Because of this we've created resources to help you navigate this process. These are included in the Press Information Package ...
Recommended Clearances using T-SIM software
There are a lot of factors to consider when choosing specific clearances for simulation and optimization. Equipment conditions (transfer slop, gripper air systems, press braking, etc.), controller capabilities, automation, die design, die conditions, ...
Confirmation of Changes
What is a "confirmation of changes document"? A confirmation of changes is just that, a confirmation that each change was in fact completed in the die design. Before T-SIM service can proceed to the press setup package, we need to be confident that ...
New Tooling Deliverables and How to Use Them
T-SIM Service Department Transfer Die Simulation Deliverables for New Tooling General Information we provide back: Corrective Action Reports Also known as CAR's, are the deliverable we create from the results of the simulation. The CAR's are ...
When does T-SIM make changes to Automation, Travel Distances or Design?
Why Would T-SIM’s Service Department Make Changes? While we aim to avoid modifications, our priority is to ensure the highest possible strokes per minute (SPM), confirm that suppliers adhere to customer standards, and verify that the automation being ...
New Project RFQ
Fill out the form and upload the CAD data to quote. If you have already completed the detailed RFQ Form, please include the form with the data upload. For more information visit our RFQ information page
Recheck Data
If you have updated design data for a current project, please upload it below.
RFQ Information
If you have the data ready now and would like to complete our simple RFQ form, please see New Project RFQ. If you have completed a detailed RFQ form (either word document or excel), please upload the completed form or additional details along with ...
CAD Data FAQ
CAD Data FAQ When do we send the CAD data to T-SIM service department? When to send the data depends on what service(s) the T-SIM service department is providing for you. RFQ Data: T-SIM can quote new tooling simulation using: just a detailed 2D or ...
Existing Tool Optimization Requirements
Existing Tooling Simulation & Optimization Summary: This document explains what we need from you in order to complete a T-SIM on existing tooling that is currently running in production. In addition, it explains what we will be providing back to you ...